Traffic Control Plans Across BC

We Plan the Movement That Keeps Your Projects Moving.

Your trusted partner for traffic management solutions that ensure project compliance through effective traffic control plans and TMPs, keeping your projects safe and promoting traffic safety.


Owner-operated by Brittni Bowles · 14+ years in BC traffic control · BCCSA TCP instructor · BC-wide
Services


Everything You Need to Get Moving


From single-lane closures to complex, long-term construction projects, we provide customized traffic management solutions tailored to your project's scope, location, and regulatory requirements.

Traffic Control Plans & TMPs

Site-specific Category 1, 2, and 3 traffic control plans and traffic management plans developed in accordance with the MoTT TMM (2020) and applicable municipal requirements. Permit-ready.

Risk Assessments

Site-specific risk assessments developed in accordance with WorkSafeBC OHSR Section 18.3.1. We identify traffic-related hazards, assess risks, and recommend appropriate safety measures to protect workers and the public.

Road Use Permit Support

End-to-end permit coordination for BC municipalities and provincial roads, prepared, coordinated, and submitted.

Engineer Review, Sign & Seal

When your project requires a P.Eng review, we coordinate it. You don't chase the engineer. We do.
WHY BPB


What You Actually Get


Every quote comes from the person doing the work. Transparent pricing, a real turnaround, and plans built to the current standard.

A real turnaround time, not "as soon as possible."

72 hours standard, often 1–2 business days. 24-hour rush available. You get a timeline at the quote stage, not after you've committed.

A price before you commit, not after.

Published starting rates for all three categories. Confirmed price before any work begins. See full pricing

14+ years of hands-on field experience.

Brittni started as a Traffic Control Person and worked through supervisory, inspection, training, and compliance roles, including as an independent contractor on the Trans Mountain Expansion Project, before founding BPB.

You work directly with the owner, start to finish.

BPB is owner-operated. The person who quotes your project is the person who builds it. No hand-offs to a junior drafter.
Process


From Request to Permit-Ready, in Four Steps


See the full process

01

Send your project details

Location, scope, dates, hours, and any permit requirements you already know about.

02

We assess the category and confirm the price

Category 1, 2, or 3 based on lanes, speed zone, duration, and staging. Confirmed price before any work begins.

03

We draft the plan

Site-specific to your corridor and project, built to BC TMM 2020 and the issuing municipality's requirements.

04

You receive the permit-ready document

PDF ready for submission. Revisions included until the permit office accepts it.
Testimonials

What Others are Saying

We have worked with BPB Traffic Solutions for their TMPS and have been very happy with their service. Their plans are clear, compliant and always on time. Communication with Brittni has been easy and professional. We highly recommend them for their reliable work! :)

Angie Lamb
Angie Lamb
Safeside Traffic Control Ltd.

Brittni at BPB Traffic Solutions is fantastic to work with. We use her for traffic management plans on our civil projects across the Lower Mainland. She is quick and efficient every time. Her drawings are accurate and need minimal revisions, which saves us time getting permits through with the municipalities. Highly recommend BPB Traffic Solutions to any contractor needing traffic management planning.

 Emmet Price
Emmet Price
Anderson Creek Site Developing Ltd.

Brittni and BPB Traffic Solutions have been a strong partner for our team. They’ve supported us in developing complex traffic management plans and risk assessments for projects at YVR International Airport, always bringing a practical, solutions-focused approach. Their understanding of site constraints and ability to navigate challenging requirements sets them apart. Brittni is great to work with. We highly recommend Brittni and BPB.

Brian Whelan
Brian Whelan
Whelan Construction Westcoast Inc.
Coverage


Based in Maple Ridge. Working Across BC.

We're based in Maple Ridge and take on projects anywhere in British Columbia, with real experience across the Lower Mainland, the Fraser Valley, Vancouver Island, the Interior, and the Okanagan. If your project is in BC, ask us. See full coverage

Project record


Trusted With Real BC Infrastructure

We work with general contractors and traffic control companies across the province, including projects tied to some of BC's largest infrastructure builds:

BC Hydro

Traffic management plans for BC Hydro underground duct and structure work in Surrey.

YVR

Traffic control plans and permit applications for Vancouver International Airport (YVR).

Surrey-Langley SkyTrain

Utility work associated with the Surrey-Langley SkyTrain project.

14+

Years in BC traffic control

72h

Standard turnaround

$175

Starting price, Cat 1

BC

Province-wide service
Pricing


You'll Know the Price Before You Pick Up the Phone

Most traffic control companies make you call, describe your project, and wait for a callback before they'll give you a number. We publish ours.

See full pricing

CATEGORY

1


Simple lane closures, low-speed, single-day


STARTING AT

$175

CATEGORY

2


Multi-day, collector roads, or moderate complexity


STARTING AT

$225

CATEGORY

3


High-speed, complex staging, or multi-phase


STARTING AT

$325

Rush available at +50%. Revisions included until permit-ready.
TOOL

Category Assessment

Four factors set your category. Send these details with your quote request and we confirm the category, starting price, and engineer-review requirement within one business day.
Factor Options
Lanes affected Shoulder or boulevard only · One travel lane · Two or more travel lanes
Posted speed limit 50 km/h or less · 60–70 km/h · 80 km/h or higher
Duration Single day · 2–7 days · More than one week
Staging Single stage · Multi-stage or phased
Municipality Engineer-seal rules vary: Burnaby requires a seal for Category 2 and 3
Not sure which options apply? Send what you have and we'll assess it.
FAQ


Common Questions

  • How long does it take to get a plan?

    72 hours is standard. Many Category 1 projects come back in 1–2 business days. 24-hour rush is available.

  • Do I need an engineer to stamp my plan?

    Not always. Category 1 and 2 plans typically do not require a P.Eng seal. Category 3 plans generally require engineering approval, while the City of Burnaby requires P.Eng seals for Category 2 and 3 plans.

  • What information do you need from me?

    Project location, scope, start date, working hours, and any permit requirements you already know about. If you're not sure, send what you have. We'll ask for the rest.

  • Do you handle the permit submission?

    Road use permit support is a separate service. We prepare and coordinate the submission, so you don't have to manage the permit office.

GET STARTED

Ready to Get Your Plan Moving?

Send your project details and you'll hear back within one business day, often sooner, with a scope and a price, not a sales pitch.