Traffic Control Plans in Maple Ridge, BC
BPB’s home city. Local permit knowledge, direct relationships with Engineering, and plans built to pass the first time.
Maple Ridge is BPB’s home city. We prepare more traffic control plans and road use permit applications in Maple Ridge than anywhere else, which means current, firsthand knowledge of what the City of Maple Ridge Engineering Department requires, how the review process works, and what gets plans sent back.
Maple Ridge issues a Highway Use Permit for road closures and work near traffic. Applications go to the Engineering Department. The standard review lead time is 5–10 business days, though confirm the current timeline with Engineering before you lock in a start date. Minimum insurance is $5,000,000 CGL.
Category 3 plans require an engineer seal. Category 2 may require one at the reviewer’s discretion, particularly on arterials. We flag the engineer-review requirement during the quote stage and coordinate the P.Eng review when needed.
QUICK REFERENCE
PERMIT TYPE
Highway Use Permit
ISSUING BODY
City of Maple Ridge, Engineering
INSURANCE MIN
$5,000,000 CGL
LEAD TIME
5–10 business days
ENGINEER SEAL
Cat 3 required; Cat 2 at reviewer discretion
GOVERNING BYLAW
Traffic Bylaw No. 6104
What We Handle in Maple Ridge
Traffic control plans
Category 1, 2, and 3. Built to BC TMM 2020 and City of Maple Ridge requirements. Permit-ready.
Highway Use Permit applications
Application preparation, insurance verification, submission to Engineering, and follow-up through approval.
Risk assessments
WorkSafeBC OHSR 18.3.1-compliant risk assessments. Prepared alongside the TCP or as a standalone.
Engineer review coordination
P.Eng review coordinated for Category 3 and Category 2 projects where the reviewer requires it.
TOOL
Jurisdiction Requirements
Select a municipality to see permit type, insurance requirements, lead times, and engineer-seal rules.
Maple Ridge
| Permit type | Highway Use Permit |
|---|---|
| Issuing body | City of Maple Ridge, Engineering Dept. |
| Minimum insurance | $5,000,000 CGL |
| Review lead time | 5–10 business days (confirm at application) |
| Engineer seal | Required for Category 3; Category 2 at reviewer discretion |
| Timing notes | No night-work restriction stated; confirm with Engineering |
| Governing bylaw | Municipal Class Bylaw / Traffic Bylaw No. 6104 |
Requirements confirmed at time of research. Confirm current standards with the issuing office before submitting.
Project in Maple Ridge? Send the details.