SERVICE AREA · PITT MEADOWS & MISSION, BC
Traffic Control Plans in Pitt Meadows & Mission, BC
Highway Use Permits and Street Use Permits for two Fraser Valley municipalities. Smaller review windows and streamlined processes compared to larger city neighbours.
Pitt Meadows
The City of Pitt Meadows issues a Highway Use Permit for work near traffic through Engineering & Public Works. The review lead time is typically 5–7 business days. Minimum insurance is $5,000,000 CGL. Engineer seal requirements follow the standard category assessment, no additional municipal mandate beyond what the BC TMM 2020 and category require.
PERMIT TYPE
Highway Use Permit
ISSUING BODY
City of Pitt Meadows, Engineering & Public Works
INSURANCE MIN
$5,000,000 CGL
LEAD TIME
5–7 business days
ENGINEER SEAL
Per category assessment
Mission
The District of Mission issues a Street Use Permit through Engineering. The review lead time is 5–10 business days. Minimum insurance is $5,000,000 CGL. Like Pitt Meadows, engineer seal requirements follow the standard category assessment. Confirm specific requirements per project scope with Mission Engineering.
PERMIT TYPE
Street Use Permit
ISSUING BODY
District of Mission, Engineering
INSURANCE MIN
$5,000,000 CGL
LEAD TIME
5–10 business days
ENGINEER SEAL
Per category assessment
What We Handle in Pitt Meadows and Mission
Traffic control plans
Category 1, 2, and 3. Built to BC TMM 2020 and the applicable municipality's requirements.
Permit applications
Highway Use Permit (Pitt Meadows) or Street Use Permit (Mission). Application preparation, submission, and follow-up.
Risk assessments
WorkSafeBC OHSR 18.3.1-compliant. Standalone or bundled with TCP.
Engineer review
P.Eng review when required by category. Coordinated by BPB.
Jurisdiction Lookup
Select Pitt Meadows or Mission below for the full permit requirements.
TOOL
Jurisdiction Requirements
Select a municipality to see permit type, insurance requirements, lead times, and engineer-seal rules.
Pitt Meadows
| Permit type | Highway Use Permit |
|---|---|
| Issuing body | City of Pitt Meadows, Engineering & Public Works |
| Minimum insurance | $5,000,000 CGL |
| Review lead time | 5–7 business days |
| Engineer seal | Per category assessment |
| Timing notes | Confirm per road classification; no blanket restriction on file |
| Governing bylaw | Pitt Meadows Traffic Bylaw |
Requirements confirmed at time of research. Confirm current standards with the issuing office before submitting.
Project in Pitt Meadows or Mission? Send the details.
