Traffic Control Plans in Vancouver, BC

Vancouver's permit process is the most complex in BC. Engineer seal required for Category 2 and 3. Coordinate engineer review before submission, not after.


Vancouver uses a Street Use Permit with a mandatory Traffic Control Plan component for any work affecting the road right-of-way. Applications go through the City of Vancouver Permits, Licences & Business Planning department. The review window is 10–15 business days; complex projects may require a pre-application meeting before submission is accepted.


Vancouver is one of two municipalities in the Lower Mainland, along with Burnaby, that mandates an engineer seal on Category 2 and 3 plans. Do not prepare a Category 2 or 3 plan for Vancouver without coordinating the P.Eng review first. The permit office will not accept an unsealed plan where one is required. BPB coordinates the engineer review as part of the process, so you do not need to source a P.Eng separately.


BPB has prepared traffic control plans for Vancouver projects including work for Vancouver International Airport (YVR). We know the City's submission requirements and the additional standards that apply beyond the BC TMM 2020.


Downtown and arterial corridors have strict peak-hour restrictions. Night work requires a separate permit. Insurance minimum is $5,000,000 CGL naming the City of Vancouver as additional insured.

QUICK REFERENCE


PERMIT TYPE
Street Use Permit (TCP required)


ISSUING BODY
City of Vancouver, Permits, Licences & Business Planning


INSURANCE MIN
$5,000,000 CGL + additional insured


LEAD TIME
10–15 business days


ENGINEER SEAL
Required for Category 2 and 3


NIGHT WORK
Separate permit required


GOVERNING BYLAW
Street and Traffic By-law No. 2849

Engineer seal required for Category 2 and 3

Vancouver will not accept an unsealed Category 2 or 3 plan. Coordinate P.Eng review before submission. Adding it after a rejection adds days you may not have. BPB includes engineer coordination in the quote for all Vancouver Category 2 and 3 plans.

What We Handle in Vancouver

Traffic control plans

Category 1, 2, and 3. Built to BC TMM 2020 and City of Vancouver standards. Engineer seal included for Category 2 and 3.

Street Use Permit applications

Application preparation and submission. Pre-application coordination for complex projects. Follow-up through approval.

Risk assessments

WorkSafeBC OHSR 18.3.1-compliant. Standalone or bundled with TCP.

Engineer review coordination

P.Eng review for all Category 2 and 3 plans. Coordinated by BPB, required, not optional, for Vancouver.
TOOL

Jurisdiction Requirements

Select a municipality to see permit type, insurance requirements, lead times, and engineer-seal rules.


Vancouver

Permit type Street Use Permit (TCP component required)
Issuing body City of Vancouver, Permits, Licences & Business Planning
Minimum insurance $5,000,000 CGL naming City of Vancouver as additional insured
Review lead time 10–15 business days; complex projects may require pre-application
Engineer seal Required for Category 2 and 3; engineer coordination before submission
Timing notes Downtown and arterial restrictions apply; night work permits separate; peak hour restrictions strictly enforced
Governing bylaw Vancouver Street and Traffic By-law No. 2849
Requirements confirmed at time of research. Confirm current standards with the issuing office before submitting.